Installing wind generator precautions

casva (1)
casva (2)

We often have customers inquire about the installation of wind generator,
Worried that it will not be installed, the installation is unstable.
Introduce the matters needing attention in installation:
1:Installation work on wind generator,
It can only be carried out in weather conditions where the wind speed does not exceed 3m/s to ensure safe operation
2: When assembling the wind generator,blades and empennage,
Every nut needs to be tightened to prevent the nut from turning in the air.
3:During installation, in addition to the operator, other people are not allowed to watch below, prevent any parts from falling and accidents.
4: Before installation, the operator must fasten the installation belt, wear a safety helmet, and take all protective measures.